- ELEV
- 104 ft
- COORD
- 37.8156° N · 122.5295° W

NOTE: There is limited cell service at the lighthouse.
To use the app with partial functionality on-site, download the data to your phone ahead of time.
To provide seafarers safe passage through the treacherous waters of the Golden Gate Strait, a network of lighthouses was built in the 1850s. The first light on Alcatraz illuminated the path for ships directly in front of Golden Gate, while the second light at Fort Point marked the bay's southern edge. To the north, the third light shone from Point Bonita.
Point Bonita Lighthouse is at the end of the Point Bonita Trail. Access to the lighthouse involves passing through the Point Bonita Tunnel . Access through the tunnel is open according to the following schedule:
Prismatic Power
Back in the day, Point Bonita was powered by a Fresnel lens, a design that was first developed in 1822. The genius of the Fresnel lens is that it's able to focus a natural light source into a powerful beam. Without any kind of focus, an open flame loses nearly 97% of its light. Even with reflectors, a flame still loses 83% of its light, but a Fresnel is a horse of a different color. Fresnel lenses focus a flame so intensely that they only lose 17% of their light, which is why ships could see the light at Point Bonita up to 18 miles out to sea.
Tether Kids
The lightkeeper's quarters were located right next to the lighthouse. As the work was hard and the hours long and lonely, some of the lighthouse keepers of the late 19th and early 20th century brought their families to live with them. While living on this treacherous cliff, they would strap their children into harnesses attached to ropes tied around a post whenever they played outside so they wouldn't fall off the edge during a stiff wind or while chasing after a stray ball. One must wonder if this was done more for the amusement of the parents than anything else.
"You Must Go Out..."
In 1874, the government approved plans for lifesaving stations at the entrance of Golden Gate, but not until 1899 did construction on the Point Bonita US Life Saving Station begin. Plans called for a residence, cisterns, fire and storage sheds, a garage and sidewalks. Construction was to last 90 days, but rough swells and difficult terrain delayed the project's completion. Unsafe conditions due to inclement weather even led to an accident that resulted in the contractor's foot being crushed.
Point Bonita Life Saving Station had two boats; a heavy lifeboat that was essential to navigating in the dangerous conditions of the rocky coast, and a surfboat, a lighter vessel that was launched directly through the surf. Typically, eight to ten men manned the lifesaving station, which was operated by the Coast Guard. Some say the brave men's motto was "You must go out, but you don't have to return."
Hat Cliff
A perennial stiff breeze has led to a geologic anomaly here at Point Bonita. As you walk out of the tunnel look to your left and see the thickening strata of assorted caps that's formed along the cliffside. If you're wearing a hat, be careful not to fall victim to the wily wind!
UV today 2 Low, peak 11 AM5°F cooler than normal today
No recent observation nearby. Showing the National Weather Service forecast for this hour.
Elsewhere in the park
Information China Beach Construction & Seacliff Avenue Closures Fall - Winter 2026
Park's China Beach renovation of bathhouse, lower terrace, and picnic areas is in progress. See 'more' for link to Phase 3 of China Beach project below. SFPUC waterline replacement project will cause parking restrictions, lane closures, and access controls along Sea Cliff Avenue. Visitors should expect SFPUC project on Sea Cliff Avenue to impact access to China Beach. See link to SFPUC project below: https://www.sfpuc.gov/construction-contracts/construction-projects/seacliffpumps.
NPS · checked Nov 23, 8:08 AM PT · Details
Information Upper Fort Mason Roads and Parking Area Closures Fall 2025 - Fall 2026
Roads and parking areas at upper Fort Mason will have closures during utilities and seismic retrofit projects. Closures planned Fall 2025 through Fall 2026. Lots will be fenced and used as staging areas for projects occurring at Fort Mason. Signs will be posted in advance of utilities work as project progresses through each area at Fort Mason. Read signs and do not park in posted areas. Vehicles will be towed at owner's expense.
NPS · checked Nov 23, 8:08 AM PT
This does not affect the road or Point Bonita Lighthouse. Alerts are matched by road name; check nps.gov to be sure.
Entrances
- Sutro Heights 3 mi SE
Highway cameras on the way in
- CAMPGROUNDBicentennial Campground1 mi NBicentennial Campground is currently open and reservations can be three weeks in advance.
- CAMPGROUNDKirby Cove Campground2 mi EKirby Cove Campground is open Spring - Fall.
- VISITOR CENTERLands End Lookout Visitor Center3 mi SLands End Lookout is open 7 days a week 9am to 5pm.
Place information and alerts: National Park Service (U.S. Government work). Photo: Wikimedia Commons (credit and license under the photo). Weather: National Weather Service. Elevation: USGS. Map: Google Maps. US Road Cams is not affiliated with the National Park Service.


